Page 290 - CITS - Welder - Trade Practical
P. 290
WELDER - CITS
Construct Corner joint on MS sheet 1.6 mm
in Vertical position by GTAW
Objectives
At the end of this exercise you shall be able to
• produce molten pool of required size by the manipulation of torch
• add filler metal at the required rate and place by manipulation the filler rod
• deposit fusion run with filler rod in flat position and maintain uniform arc travel speed
• clean and inspect the deposited beads for surface defects.
Job Sequence
- Cut the plate by using hacksaw cutting as per drawing
- Construct Lap joint on MS sheet 1.6 mm in Vertical position by GTAW
- Fill the crater
- Manipulate the torch and filler rod in the correct position with respect job
- Stop the weld at the left-hand edge of the joint after filling up in the crater at the end of the weld
- The angular distortion between the vertical and horizontal sheets of the Tee joint is automatically controlled
- The current set is 10 to 15 amperes
- At the end of the welding perform the carter filler treatment by repeating the torch switch ON-OFF
- Cut the arc and hold at the finishing point unit molten metal solidifies
- Visual inspection: slight convexity, uniform width, uniform ripples and free from under cut at the toes of the
weld indicate a smooth
273
CITS : C G & M - Welder - Exercise 73 CITS : C G & M - Welder - Exercise 73