Page 237 - CITS - Fitter Trade Pactical - Volume - 2
P. 237

FITTER - CITS



           EXERCISE 56 : Conduct a preliminary check of readiness
                                      of the CNC turning centre



            Objectives

           At the end of this exercise you shall be able to
           •  check cleanliness of the  machine
           •  check oil levels
           •  check correct working of lubrication system
           •  send the turret to machine reference point.
































           Job Sequence

           •  Ensure the cleanliness of machine.
           •  Use banian waste to clean.
           •  Ensure there is no oil spill around the machine.

           •  Switch ‘ON’ the  Machine.
           •  Move the tool in JOG mode to a safe place.
           •  Send the  turret to machine Reference point.
           •  Check the  lubrication oil level and ensure it is within the acceptable level.

           •  Check hydraulic oil level.
           •  Check coolant oil level.
           •  Check correct working of lubrication system by manual operation.













                                                           222
   232   233   234   235   236   237   238   239   240   241   242