EXERCISE 56 : Conduct a preliminary check of readiness
of the CNC turning centre
Objectives
At the end of this exercise you shall be able to
• check cleanliness of the machine
• check oil levels
• check correct working of lubrication system
• send the turret to machine reference point.
Job Sequence
• Ensure the cleanliness of machine.
• Use banian waste to clean.
• Ensure there is no oil spill around the machine.
• Switch ‘ON’ the Machine.
• Move the tool in JOG mode to a safe place.
• Send the turret to machine Reference point.
• Check the lubrication oil level and ensure it is within the acceptable level.
• Check hydraulic oil level.
• Check coolant oil level.
• Check correct working of lubrication system by manual operation.