Page 194 - CITS - Fitter Trade Practical - Volume -2
P. 194

FITTER - CITS
            Job Sequence


           •  Construct circuit diagram
           •  Assemble circuit according to circuit diagram

           •  carry out the exercise
           Practice exercise
           Set the following
           •  operating pressure p (50 bar)
           •  one - way throttle valve,position 2

           Enter the following in the table
           •  flow paths,operating positions
           •  pressures p  and p
                        o2     o3
           •  forces F  and F  and F (to be calculated)
                     1
                           2






















           Safety precautions
           Only switch on the power unit upon directions from the instructor.
           Make sure the standing area is safe. Do not spill any oil. Do not work with oily hands (danger of slipping off).
           Fault finding and dismantling only when the system has been depressurized.
































                                                           179

                                            CITS : C G & M - Fitter - Exercise 89
   189   190   191   192   193   194   195   196   197   198   199