Page 262 - CITS - Electrician - Trade Practical
P. 262

ELECTRICIAN - CITS



           EXERCISE 99 : Check wiring on UPS & Inverter



            Objectives
           At the end of this exercise you shall be able to
           •  record the details of UPS
           •  check wiring of the UPS
           •  record the details of UPS
           •  check the wiring of inverter.
           Requirements


           Tools/Instruments
           •   Trainees kit                      - 1 Set       •  Battery 12V/120AH                - 1 No.
           •   Portable electric drilling machine 6mm  - 1 No  Materials/Components
           •   Star head screw driver set (set of 6mm) - 1 No.
           •   Rawl jumper No.8                  - 1 No.       •  4 way MCB -20A                   - 1 No.
           •   Cutting plier 150mm               - 1 No.       •   1.5mm2 P.V.C. copper (1/18)wires   - as reqd.
           •   D.E spanner set 6mm-25mm          - 1 Set       •   Auto wires (stranded)           - as reqd.
           •   Ballpein hammer 0.75 kg           - 1 No.       •   I.C.D.P switch 16A/250V         - 1 No.
           •   Single phase energy meter 250V/15A   - 1 No     •   4 way MCB/ICDP20 A switch       - 1 No.
           •   Multi pin socket 3/5 pin 250V/6A    - 1 No.     •   Power socket 250 V/16A          - 1 No.
           Equipments/Machinery                                •   Multi pin wall socket 250V/6A    - 1 No.
                                                                  (2 in one) with switch

           •   200W/250V/6A -inverter            - 1 No.       •  Grease/Vaseline                  - as reqd.

            Procedure                                       t

           TASK 1: Record the details of UPS
           1  Record name plate details

             Sl.No               Description                        Value                    Remarks
            1        Name of manufacturer
            2        Model No
            3        Sl.No
            4        Capacity                            KVA

            5        Type                                Online / offline /Line interactive
            6        Type of battery                     VRLA / SMF / Ni-Cd/Li-ion
            7        No of batteries
            8        Voltage of battery bank
            9        Combination of battery bank

            10       Capacity of 1 battery


           TASK 2:

           1  Trace wiring of UPS and verify with instruction manual of manufacturer.
           2  Test the insulation resistance between conductor and body of UPS.
           3  Test earth continuity.
           4  Check tightness of connections of battery and UPS terminals.



                                                           245

 CITS : Power - Electrician & Wireman - Exercise 98
   257   258   259   260   261   262   263   264   265   266   267