Page 272 - CTS - Mechanic Diesel - TP
P. 272

MECHANIC DIESEL - CITS


           EXERCISE 15.4:  Servicing  of In line pump Pneumatic

                                       Governor

            Objectives

           At the end of this exercise you shall be able to
           •  dismantle, Inspect and assemble the Pneumatic Governor
           •  check control rack travel, Tightness test and governor spring
           •  set full load stop screw and Idling spring stopper
           •  check and Adjust full load delivery.
           Requirements

           Tools/Equipments                                     Materials

           •  Trainee’stoolkit                 - 1 No.          •  Tray                         - as reqd.
                                                                •  Cottoncloth                  - as reqd.
           Equipments                                           •  Kerosene                     - as reqd.
           •  Fuel Injection pump test bench   - 1No.           •  Diesel                       - as reqd.
           •  Inline FIP with RQV governor     - 1No.           •  Adjusting shims              - as reqd.
           •  Dial test indicator                              - 1 No  •  Soap Oil              - as reqd.
           •  Vernier caliper                              - 1 No.  •  Engine oil               - as reqd.
           •  Governor setting deflection scale                 •  Hydraulic transmission Oil   - as reqd.
              (special tool)                   - 1No.           •  Calibration oil              - as reqd.
           •  Circular control Rack measuring
              scale(special tool)              - 1 No.

            Procedure

           Dismantling











































                                                           255
   267   268   269   270   271   272   273   274   275   276   277