           EXERCISE 65: Make Square butt joint on MS sheet 2 mm
                                    in Vertical position by GTAW.

           Objectives

           At the end of this exercise you shall be able to
           •  produce molten pool of required size by the manipulation of torch
           •  add filler metal at the required rate and place by manipulation the filler rod
           •  deposit fusion run with filler rod in flat position and maintain uniform arc travel speed
           •  clean and inspect the deposited beads for surface defects.


















           Job Sequence

           •  Cut the plate by using hacksaw cutting as per drawing
           •  Set the sheets and tack weld in the form of a “Square butt” joint on the welding in flat position
           •  Fill the crater
           •  Manipulate the torch and filler rod in the correct position with respect job

           •  Stop the weld at the left-hand edge of the joint after filling up in the crater at the end of the weld
           •  The angular distortion between the vertical and horizontal sheets of the Butt joint is automatically controlled
           •   The current set is 10 to 15 ampere
           •  At the end of the welding perform the carter filler treatment by repeating the torch switch ON-OFF
           •  Cut the arc and hold at the finishing point unit molten metal solidifies

           •  Visual inspection: slight convexity ,uniform width ,uniform ripples And free from under cut at the toes of the
              weld indicate a smooth.