Page 63 - CITS - Fitter Trade Practical - Volume -2
P. 63
FITTER - CITS
Place the rivet snap over the rounded head of the rivet and strike with a hammer over it to form and finish the
rivet head using a ball peen hammer. (Fig 6)
Fig 5
Fig 6
Double riveted lap joint (Chain Seam)
Objectives: At the end of this exercise you shall be able to
• Mark and cut the sheet metal safely using a hand lever bench shears
• layout the spacing of rivets to make double riveted lap joint (chain) correctly
• make double riveted lap joint (Chain), to join sheet metal pieces with the required strength and without
slackness
• remove faulty rivets from sheet metal riveted joints by drilling
• remove faulty rivets from sheet metal riveted joints by punching.
48
CITS : C G & M - Fitter - Exercise 64