Page 160 - CITS - Welder - Trade Practical
P. 160
WELDER - CITS
EXERCISE 34 : Pipe tee joint on M.S. pipe (flat position)
Objectives
At the end of this exercise you shall be able to
• prepare the development for pipe Tee fillet joint and cut the template
• mark the pipes by using a template
• cut the marked area by using an oxy-acetylene cutting blowpipe or a hand hacksaw
• set and tack weld the 90° pipe Tee joint with 1.6 mm root gap
• deposit the root and second runs of weld beads
• inspect the welds.
143
CITS : C G & M - Welder - Exercise 33