Page 160 - CITS - Welder - Trade Practical
P. 160

WELDER - CITS


           EXERCISE 34 : Pipe tee joint on M.S. pipe (flat position)

            Objectives

           At the end of this exercise you shall be able to
           •  prepare the development for pipe Tee fillet joint and cut the template
           •  mark the pipes by using a template
           •  cut the marked area by using an oxy-acetylene cutting blowpipe or a hand hacksaw
           •  set and tack weld the 90° pipe Tee joint with 1.6 mm root gap
           •  deposit the root and second runs of weld beads
           •  inspect the welds.






































































                                                           143

 CITS : C G & M - Welder - Exercise 33
   155   156   157   158   159   160   161   162   163   164   165