Page 240 - CITS - Fashion Design Technology - Trade Theory
P. 240

FASHION DESIGN & TECHNOLOGY - CITS



              •   Narrow Goods
              •   Ply height

              •   Remnants
              •   Marker placing
           b  After cutting quality control: After each cutting blocks and bundles are checks on the following points.
              •   Miss cut
              •   Ragged cutting

              •  Pattern checks
              •   Matching Plies
              •   Notches
           In process quality control (Sewing)

           During the swing “In process quality control” is done by the line QC’s through 7 pcs inspection system.For critical
           operations 100% process inspection are carried out. The following parameters are also checked in sewing process
              a  Machine check.
              b  Tension.

              c  SPI checks
              d  Needle check.
              e  Cleanness.
              d  Table inspection.
              f  Inspection before wash.

           Quality control in washing section:
              a  Garments handling
              b  Wash standard.
              c  After wash thoroughly inspection.

           Quality control in finishing sections:
           Following inspection/audit is done to attain AQL (1.5/2.5/4.0 etc).
              a  Process inspection: Garments are checked process wise in the finishing section to identify defects and
                 pass only the passed garments.

              b  Two hourly audit: Every after two-hours audit is done on finishing lot to attain AQL the required AQL.
              c  Days final audit: At the end of the day accumulated lot of finished garments are statistically audited to
                 attain required AQL.

              d  Lot final audit: On completion of packing of one complete lot of garment, QA manager conduct statistical
                 audit based on required AQL garments. Garments are offered for final inspection by buyer /clients for
                 shipment only when these are through in this audit.

           The following parameters are also checked in sewing process
              a  After wash garments must be keep in the box /table covering.
              b  Thread sucking.
              c  Iron inspection.

              d  Measurements inspection.
              e  Poly inspection of top of garments.
              f  Inspection before cartooning.