Page 240 - CITS - Fashion Design Technology - Trade Theory
P. 240
FASHION DESIGN & TECHNOLOGY - CITS
• Narrow Goods
• Ply height
• Remnants
• Marker placing
b After cutting quality control: After each cutting blocks and bundles are checks on the following points.
• Miss cut
• Ragged cutting
• Pattern checks
• Matching Plies
• Notches
In process quality control (Sewing)
During the swing “In process quality control” is done by the line QC’s through 7 pcs inspection system.For critical
operations 100% process inspection are carried out. The following parameters are also checked in sewing process
a Machine check.
b Tension.
c SPI checks
d Needle check.
e Cleanness.
d Table inspection.
f Inspection before wash.
Quality control in washing section:
a Garments handling
b Wash standard.
c After wash thoroughly inspection.
Quality control in finishing sections:
Following inspection/audit is done to attain AQL (1.5/2.5/4.0 etc).
a Process inspection: Garments are checked process wise in the finishing section to identify defects and
pass only the passed garments.
b Two hourly audit: Every after two-hours audit is done on finishing lot to attain AQL the required AQL.
c Days final audit: At the end of the day accumulated lot of finished garments are statistically audited to
attain required AQL.
d Lot final audit: On completion of packing of one complete lot of garment, QA manager conduct statistical
audit based on required AQL garments. Garments are offered for final inspection by buyer /clients for
shipment only when these are through in this audit.
The following parameters are also checked in sewing process
a After wash garments must be keep in the box /table covering.
b Thread sucking.
c Iron inspection.
d Measurements inspection.
e Poly inspection of top of garments.
f Inspection before cartooning.
227
CITS : Apparel - Fashion Design & Technology - Lesson 34 - 39