Page 258 - CTS - Mechanic Diesel - TP
P. 258
MECHANIC DIESEL - CITS
EXERCISE 15.3: Servicing of Inline FIP Idle and Maximum
speed Governor
Objectives
At the end of this exercise you shall be able to
• dismantle, Inspect and assemble the RSV Governor
• carryout mechanical testing of RSV governor
• check and Adjust full load delivery, maximum speed control and Adaption capsule
• set idling speed, Governor cutting in speed and starting travel of control rack.
Requirements
Tools/Equipments Materials
• Trainee’stoolkit - 1 No. • Tray - as reqd.
• Cottoncloth - as reqd.
Equipments • Kerosene - as reqd.
• Fuel Injection pump test bench - 1No. • Diesel - as reqd.
• Inline FIP with RQV governor - 1No. • Adjusting shims - as reqd.
• Dial test indicator - 1 No • Soap Oil - as reqd.
• Vernier caliper - 1 No. • Engine oil - as reqd.
• Governor setting deflection scale • Hydraulic transmission Oil - as reqd.
(special tool) - 1No. • Calibration oil - as reqd.
• Circular control Rack measuring
scale(special tool) - 1 No.
Procedure
Fig 1
241